- Product Categories
- Horizontal milling machine
- Universal milling machine
- XL6332 Series multifunction..
- Rong specifically for XL503..
- XL5032 series of vertical l..
- VMC850 of CNC machining
- Milling
- Machining Center
- CNC milling machines
- Friendly Links
- home > Supply > Specializing in the production of high-precision milling machine XL6332 series multifunction affordable universal milling machine milling machine
Specializing in the production of high-precision milling machine XL6332 series multifunction affordable universal milling machine milling machine
Information Name: | Specializing in the production of high-precision milling machine XL6332 series multifunction affordable universal milling machine milling machine |
Published: | 2015-04-15 |
Validity: | 360 |
Specifications: | XL6332 |
Quantity: | 1000.00 |
Price Description: | |
Detailed Product Description: | 1. XL6332 series of multi-purpose milling machine is a universal metal cutting machine, this machine spindle taper directly or install a variety of cylindrical cutter, end mills and other tools by attachment, fitted with a rotary table can be milling attachment ring grooves and circular curves. Head to the right or left can swing 90 °, the ram horizontally rotating 180 °, suitable for processing a variety of medium and small parts of the plane, bevel, groove, hole, gears, mechanical manufacturing, tooling, equipment, instrumentation, automotive, motorcycle and other sectors of the ideal processing equipment. 2. Advanced advantage of the machine structure, reasonable, light and flexible operation, easy maintenance. Also install digital display feet, for batch processing easier, more accurate positioning. 3. Features of the machine table can be vertical, horizontal and vertical lift manual feed, while at the same vertical and horizontal mobility to achieve fast forward, automatic feed and vertical automatic lifting. Main drive and automatic feed are used gear transmission structure, the main drive gear shift by three, to get the spindle 60 to 1800 rev / min 12 different speed, wide speed range. Workbench vertical, horizontal, lifting each of eight different feed rate. Three spindle support structure, improve the stiffness of the spindle system. Inspection, repair and maintenance ▲: Depending on the operating personnel to provide a clear case of machine failure; ▲: to develop inspection and maintenance procedures and scope of work; ★: the implementation of the maintenance program, the "being maintenance" sign, placed around the machine; ★: Turn off the main power switch is turned on in order to prevent the occurrence of sudden external power crisis situation, would read, "to refrain from closing the switch," the warning signs hanging on the main power switch; ★: When working in the machine, Do not forget to turn off the main power supply, and "to refrain from closing the switch," the warning signs hanging on the main power switch; ★: Do not touch cables, electrical appliances with wet hands, switch; ★: Be careful not to touch or bump NC control unit and electrical lines; △: When commissioning the machine, check the NC parameter control unit and ensure correct. In addition to adjusting the backlash, the user may not change any of the parameters NC control unit. ▲: Use standard and special tools; ▲: Do not put tools or clothes on the moving parts; ★: When using the lifting machinery, allowing only after inspection and approval of the use of wire rope, hook and pulley ▲: Replacement parts must be used specified parts. If a problem occurs during use, please contact with me, and tell the machine's manufacture date and serial number, I wholeheartedly for your service. Machine transportation, unpacking, installation and commissioning a transport: packed machine required a crane with a roll bar or transported to the designated place, if the crane, the crane's cable must be negative by more than 4 tons of weight, When rolling on an inclined wooden ship, wooden slope should not exceed 10 degrees. After carrying out of the box when the machine, according to lifting (see Figure 8) setting the position as shown in the rope, should open before the lifting table to the place near the bed, careful not to make direct contact with the machine cable to avoid damage paint, best wooden mat mat. 2, after unpacking the box should immediately check the packing list all accessories are available, handle and prominent part of the machine to check for damage during transport, such as attachment failure should be immediately made, by the use of a machine, the manufacturer is no longer responsible for. 3, the installation in order to make the machine work smooth and precise, must follow the ground (see Figure 10) the size of the concrete foundation of good, solid foundation to be poured on the soil. Best to advance tamping, determined according to the depth of the foundation soil. When the machine is placed on the foundation, before pouring the concrete, must scale both in the vertical and horizontal direction adjusting levels and then concrete is poured, after fully dry evenly tighten the ground screw, and then check the level of the machine, in the table both vertical and horizontal directions countertops, a tolerance of 0.04 / 1000 or less. 4, must be carefully cleaned before the test machine test machine the parts with kerosene rust oil, can not use metal tools and other enough to scratch the surface of the part of the appliance Cayou later cleaned, the exposed metal surface coated with a thin layer of oil. Before the test, fill up the lubrication unit, lubrication points once refueling and inspection. Before commissioning the machine, you should check the connector plug is loose, to prevent vibration due to transport loose plug, the impact of signal transmission or burned plugs, sockets. If loose, be sure to re-inserted firmly tightened. Be sure to read the instructions before the machine test machine, computer control system, technical specifications, to understand the structure of the machine, familiar with the manipulation and use of the site, use the familiar device and method of use of the function keys to control. Check the working conditions of the various parts of the machine manually. Main motor power tools before, you should check the electrical system is intact, check the motor damp. When powered on, check the motor rotation direction and the direction of rotation of the machine tool calibration plate as stated wiring, check the coolant pump is working properly. Before controlling system power, check the power voltage is normal, and then give the computer transmission. Referring to the microcomputer control system technical specifications, familiar with the function and use of the function keys, check whether the key is working properly. Above the inspection is completed, then the empty inspection, repair and maintenance ▲: Depending on the operating personnel to provide a clear case of machine failure; ▲: to develop inspection and maintenance procedures and scope of work; ★: the implementation of the maintenance program, the " are maintenance "sign, placed around the machine; ★: Turn off the main power switch is turned on in order to prevent the occurrence of sudden external power crisis situation, would read," to refrain from the switch is closed, "the warning signs hanging in the main power switch on ; ★: When working in the machine, do not forget to turn off the main power supply, and "to refrain from closing the switch," the warning signs hanging on the main power switch; ★: Do not touch the cable with wet hands, electrical appliances, switch; ★: Be careful not to touch or bump NC control unit and electrical lines; △: When commissioning the machine, check the NC parameter control unit and ensure correct. In addition to adjusting the backlash, the user may not change any of the parameters NC control unit. ▲: Use standard and special tools; ▲: Do not put tools or clothes on the moving parts; ★: When using the lifting machinery, allowing only after inspection and approval of the use of wire rope, hook and pulley ▲: Replacement parts must be used specified parts. If a problem occurs during use, please contact with me, and tell the machine's manufacture date and serial number, I wholeheartedly for your service. Machine transportation, unpacking, installation and commissioning a transport: packed machine required a crane with a roll bar or transported to the designated place, if the crane, the crane's cable must be negative by more than 4 tons of weight, When rolling on an inclined wooden ship, wooden slope should not exceed 10 degrees. After carrying out of the box when the machine, according to lifting (see Figure 8) setting the position as shown in the rope, should open before the lifting table to the place near the bed, careful not to make direct contact with the machine cable to avoid damage paint, best wooden mat mat. 2, after unpacking the box should immediately check the packing list all accessories are available, handle and prominent part of the machine to check for damage during transport, such as attachment failure should be immediately made, by the use of a machine, the manufacturer is no longer responsible for. 3, the installation in order to make the machine work smooth and precise, must follow the ground (see Figure 10) the size of the concrete foundation of good, solid foundation to be poured on the soil. Best to advance tamping, determined according to the depth of the foundation soil. When the machine is placed on the foundation, before pouring the concrete, must scale both in the vertical and horizontal direction adjusting levels and then concrete is poured, after fully dry evenly tighten the ground screw, and then check the level of the machine, in the table both vertical and horizontal directions countertops, a tolerance of 0.04 / 1000 or less. 4, must be carefully cleaned before the test machine test machine the parts with kerosene rust oil, can not use metal tools and other enough to scratch the surface of the part of the appliance Cayou later cleaned, the exposed metal surface coated with a thin layer of oil. Before the test, fill up the lubrication unit, lubrication points once refueling and inspection. Before commissioning the machine, you should check the connector plug is loose, to prevent vibration due to transport loose plug, the impact of signal transmission or burned plugs, sockets. If loose, be sure to re-inserted firmly tightened. Be sure to read the instructions before the machine test machine, computer control system, technical specifications, to understand the structure of the machine, familiar with the manipulation and use of the site, use the familiar device and method of use of the function keys to control. Check the working conditions of the various parts of the machine manually. Main motor power tools before, you should check the electrical system is intact, check the motor damp. When powered on, check the motor rotation direction and the direction of rotation of the machine tool calibration plate as stated wiring, check the coolant pump is working properly. Before controlling system power, check the power voltage is normal, and then give the computer transmission. Referring to the microcomputer control system technical specifications, familiar with the function and use of the function keys, check whether the key is working properly. Above the inspection is completed, then the empty running test, experiment, at the lowest speed idling more than 30 minutes, then gradually increase speed test speed operation at all levels. Experiment, check the machine lubrication systems, control systems, operating systems, electrical systems, and the part of the cooling system is working properly when running before beginning work. Contact us: Tengzhou Heineken Machine Co., Ltd. Address: Tengzhou City, North Xin Lu (new stadium north 200 meters) Tel: 0632-5603977 5603992 phone: 15698025606 QQ: 2901709393 |
Admin>>>
You are the 11201 visitor
Copyright © GuangDong ICP No. 10089450, Machine Co., Ltd. Shandong Rong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 11201 visitor
Copyright © GuangDong ICP No. 10089450, Machine Co., Ltd. Shandong Rong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility