- Product Categories
- Horizontal milling machine
- Universal milling machine
- XL6332 Series multifunction..
- Rong specifically for XL503..
- XL5032 series of vertical l..
- VMC850 of CNC machining
- Milling
- Machining Center
- CNC milling machines
- Friendly Links
Information Name: | XK6032 CNC vertical milling machine manufacturers selling Latest Offers |
Published: | 2015-04-15 |
Validity: | 360 |
Specifications: | XK6032 |
Quantity: | 1000.00 |
Price Description: | |
Detailed Product Description: | The main technical parameters Specification XK6032 work table size Table size mm 1600 * 320 T-slot table number / width / center distance T slots (N * W * D) mm 3/18/70 Longitudinal travel Longitudinal travel mm 900 table Transverse travel Cross travel mm 310 Table vertical stroke Vertical travel mm 410 Longitudinal motor feed Table longitudinal feed (auto) - stepless (in finite) transverse motorized table feed Table cross feed (auto) - stepless ( in finite) vertical motorized table feed Table vertical feed (auto) - stepless (in finite) spindle taper Spindle hole taper - spindle taper ISO 50 (7:24) Spindle speed range Spindle speed step spindle speed level 18 range Spindle speed range r / min 30-1500 main motor power Power of spindle motor kw 7.5 XYZ feed servo motor torque XYZ to feed Ac servo motor torque Nm 10/10/23 Machine Dimensions Overall size mm 2040 * 1800 * 1800 machine Net Net weight kg 2850 inspection, repair and maintenance ▲: clear the machine operator failure under the circumstances provided; ▲: to develop inspection and maintenance procedures and scope of work; ★: implementing maintenance plan, "is the maintenance" The signs, placed around the machine; ★: Turn off the main power switch is turned on in order to prevent the occurrence of sudden external power crisis situation, would read, "to refrain from closing the switch," the warning signs hanging on the main power switch; ★: in inside the machine at work, do not forget to turn off the main power supply, and "to refrain from closing the switch," the warning signs hanging on the main power switch; ★: Do not touch cables, electrical with wet hands, switch; ★: Be careful not to touch or bump NC control unit and electrical lines; △: When commissioning the machine, check the NC parameter control unit and ensure correct. In addition to adjusting the backlash, the user may not change any of the parameters NC control unit. ▲: Use standard and special tools; ▲: Do not put tools or clothes on the moving parts; ★: When using the lifting machinery, allowing only after inspection and approval of the use of wire rope, hook and pulley ▲: Replacement parts must be used specified parts. If a problem occurs during use, please contact with me, and tell the machine's manufacture date and serial number, I wholeheartedly for your service. Machine transportation, unpacking, installation and commissioning a transport: packed machine required a crane with a roll bar or transported to the designated place, if the crane, the crane's cable must be negative by more than 4 tons of weight, When rolling on an inclined wooden ship, wooden slope should not exceed 10 degrees. After carrying out of the box when the machine, according to lifting (see Figure 8) setting the position as shown in the rope, should open before the lifting table to the place near the bed, careful not to make direct contact with the machine cable to avoid damage paint, best wooden mat mat. 2, after unpacking the box should immediately check the packing list all accessories are available, handle and prominent part of the machine to check for damage during transport, such as attachment failure should be immediately made, by the use of a machine, the manufacturer is no longer responsible for. 3, the installation in order to make the machine work smooth and precise, must follow the ground (see Figure 10) the size of the concrete foundation of good, solid foundation to be poured on the soil. Best to advance tamping, determined according to the depth of the foundation soil. When the machine is placed on the foundation, before pouring the concrete, must scale both in the vertical and horizontal direction adjusting levels and then concrete is poured, after fully dry evenly tighten the ground screw, and then check the level of the machine, in the table both vertical and horizontal directions countertops, a tolerance of 0.04 / 1000 or less. 4, must be carefully cleaned before the test machine test machine the parts with kerosene rust oil, can not use metal tools and other enough to scratch the surface of the part of the appliance Cayou later cleaned, the exposed metal surface coated with a thin layer of oil. Before the test, fill up the lubrication unit, lubrication points once refueling and inspection. Before commissioning the machine, you should check the connector plug is loose, to prevent vibration due to transport loose plug, the impact of signal transmission or burned plugs, sockets. If loose, be sure to re-inserted firmly tightened. Be sure to read the instructions before the machine test machine, computer control system, technical specifications, to understand the structure of the machine, familiar with the manipulation and use of the site, use the familiar device and method of use of the function keys to control. Check the working conditions of the various parts of the machine manually. Main motor power tools before, you should check the electrical system is intact, check the motor damp. When powered on, check the motor rotation direction and the direction of rotation of the machine tool calibration plate as stated wiring, check the coolant pump is working properly. Before controlling system power, check the power voltage is normal, and then give the computer transmission. Referring to the microcomputer control system technical specifications, familiar with the function and use of the function keys, check whether the key is working properly. Above the inspection is completed, then the empty inspection, repair and maintenance ▲: Depending on the operating personnel to provide a clear case of machine failure; ▲: to develop inspection and maintenance procedures and scope of work; ★: the implementation of the maintenance program, the " are maintenance "sign, placed around the machine; ★: Turn off the main power switch is turned on in order to prevent the occurrence of sudden external power crisis situation, would read," to refrain from the switch is closed, "the warning signs hanging in the main power switch on ; ★: When working in the machine, do not forget to turn off the main power supply, and "to refrain from closing the switch," the warning signs hanging on the main power switch; ★: Do not touch the cable with wet hands, electrical appliances, switch; ★: Be careful not to touch or bump NC control unit and electrical lines; △: When commissioning the machine, check the NC parameter control unit and ensure correct. In addition to adjusting the backlash, the user may not change any of the parameters NC control unit. ▲: Use standard and special tools; ▲: Do not put tools or clothes on the moving parts; ★: When using the lifting machinery, allowing only after inspection and approval of the use of wire rope, hook and pulley ▲: Replacement parts must be used specified parts. If a problem occurs during use, please contact with me, and tell the machine's manufacture date and serial number, I wholeheartedly for your service. Machine transportation, unpacking, installation and commissioning a transport: packed machine required a crane with a roll bar or transported to the designated place, if the crane, the crane's cable must be negative by more than 4 tons of weight, When rolling on an inclined wooden ship, wooden slope should not exceed 10 degrees. After carrying out of the box when the machine, according to lifting (see Figure 8) setting the position as shown in the rope, should open before the lifting table to the place near the bed, careful not to make direct contact with the machine cable to avoid damage paint, best wooden mat mat. 2, after unpacking the box should immediately check the packing list all accessories are available, handle and prominent part of the machine to check for damage during transport, such as attachment failure should be immediately made, by the use of a machine, the manufacturer is no longer responsible for. 3, the installation in order to make the machine work smooth and precise, must follow the ground (see Figure 10) the size of the concrete foundation of good, solid foundation to be poured on the soil. Best to advance tamping, determined according to the depth of the foundation soil. When the machine is placed on the foundation, before pouring the concrete, must scale both in the vertical and horizontal direction adjusting levels and then concrete is poured, after fully dry evenly tighten the ground screw, and then check the level of the machine, in the table both vertical and horizontal directions countertops, a tolerance of 0.04 / 1000 or less. 4, must be carefully cleaned before the test machine test machine the parts with kerosene rust oil, can not use metal tools and other enough to scratch the surface of the part of the appliance Cayou later cleaned, the exposed metal surface coated with a thin layer of oil. Before the test, fill up the lubrication unit, lubrication points once refueling and inspection. Before commissioning the machine, you should check the connector plug is loose, to prevent vibration due to transport loose plug, the impact of signal transmission or burned plugs, sockets. If loose, be sure to re-inserted firmly tightened. Be sure to read the instructions before the machine test machine, computer control system, technical specifications, to understand the structure of the machine, familiar with the manipulation and use of the site, use the familiar device and method of use of the function keys to control. Check the working conditions of the various parts of the machine manually. Main motor power tools before, you should check the electrical system is intact, check the motor damp. When powered on, check the motor rotation direction and the direction of rotation of the machine tool calibration plate as stated wiring, check the coolant pump is working properly. Before controlling system power, check the power voltage is normal, and then give the computer transmission. Referring to the microcomputer control system technical specifications, familiar with the function and use of the function keys, check whether the key is working properly. Above the inspection is completed, then the empty running test, experiment, at the lowest speed idling more than 30 minutes, then gradually increase speed test speed operation at all levels. Experiment, check the machine lubrication systems, control systems, operating systems, electrical systems, and the part of the cooling system is working properly when running before beginning work. Contact us: Tengzhou Heineken Machine Co., Ltd. Address: Tengzhou City, North Xin Lu (new stadium north 200 meters) Tel: 0632-5603977 5603992 phone: 15698025606 QQ: 2901709393 |
Admin>>>
You are the 11201 visitor
Copyright © GuangDong ICP No. 10089450, Machine Co., Ltd. Shandong Rong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 11201 visitor
Copyright © GuangDong ICP No. 10089450, Machine Co., Ltd. Shandong Rong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility